A Study on the Method of Time-Resource Optimization of Engineering Projects


CAO Xiao lin,WANG Jin gen

DOI:10.11835/j.issn.1674-4764.2000.02.012

Received ,Revised , Accepted , Available online July 01, 2015

Volume ,2000,Pages 49-53

  • Abstract
This paper investigates the coordinated operation of the progress planning with the resource planning when carrying out engineering projects and puts forward a method of "RSM" under the resource limit conditions. Then, the "RSM" was improved to avoid complicated calculation. This method not only reduces the calculating work by hand but saves computer's memory as well, making the time-resource optimization work more quick and convenient.